We have strengthened our fleet with Osman Gazi!
With the addition of the Floating Production Unit (FPU) Osman Gazi to our fleet, we are now stronger in offshore natural gas production operations.
Osman Gazi set sail from Singapore on 30 July 2024 and, after a journey of approximately two months, passed through the Çanakkale Strait on 20 September 2024 to arrive at İÇDAŞ Shipyard for maintenance.
Placed in dry dock on 26 September 2024, Osman Gazi underwent module removals, steel/plate renewal, deck reinforcement, and maintenance and repair of existing equipment, and, upon completion of these works, set sail on 27 May 2025 to arrive in Filyos.1
Osman Gazi is 298.5 meters in length, 56 meters in breadth, and 29.5 meters in depth. It will commence operations in mid-2026.
With our platform, which has a maximum natural gas processing capacity of 10.5 million cubic meters and a maximum gas transfer capacity of 10 million cubic meters, we aim to double the current natural gas production in the Black Sea to 20 million cubic meters per day.
Technical Specifications of Osman Gazi
Floating Production Unit (FPU): 298.45 metres in length, 56 metres in breadth, and 29.5 metres in depth. Operational draught is 12.5 metres.
Gross Tonnage: 143,809.00 tons
Net Tonnage: 43,143.00 tons
Year/Place of Construction: 1989 (cargo vessel), South Korea
Year/Place of Conversion into Floating Production Unit: 2008, Singapore
IMO No: 8706014
Accommodation Capacity: 140 persons
Number of Operating Personnel: 64 persons
Design Life: 20 years
Max. Gas Processing Capacity: 10.5 million m³
Max. Gas Transfer Capacity: 10 million m³
Max. Gas Consumption: 500,000 m³
MEG Regeneration Capacity: 1,502 m³/day
Max. Water Production Capacity: 773 m³/day
TEG Drying Unit Capacity: 10 million m³
Power Generation Capacity: 30 MW
Main Gas Transmission Line: 161 km
Main Umbilical Line: 22 km
Main MEG Transmission Line: 22 km
Number of Connected Manifolds: 2 manifolds
Number of Wells Connected to Manifolds: 10 wells